Repair, Recover, Or Replace
What a Winchester Commercial Roofing Contractor Checks First
Each roof area gets one of three paths after a Winchester commercial roofing contractor walks it, cuts cores, and checks the deck from below.
Spot Repair
Recover
What We Install
Tear-Off And New Roof
Roof condition
A few open seams, a split pipe boot, or one clogged drain
One dry layer, firmly attached, over a solid deck
Wet insulation, two existing layers, or a rusted deck
What comes off
Only the damaged piece of membrane or flashing
Nothing below the new cover board
Everything down to the deck
Deck view
The repair area only
Core cuts at set points
The full deck, section by section
Insulation
Stays in place
Added above the old roof
New boards, tapered where water sits
Dumpster and dust
Small
Low
Highest, staged away from your entrances
A moisture scan and core cuts decide the path. Building code limits recovers over wet roofs and over roofs that already carry two layers.